Case Details

post28
POLDOS Control Panel Upgrade – Lafarge Cement Egypt

Upgraded Siemens S5 systems to Siemens S7 (CPU 314 & 315) for production lines 1–4.
Designed, supplied, installed, and commissioned new control panels.
Performed signal testing, cold run tests, and sequence testing.

Project photos

A successful automation and control system upgrade project aimed at improving operational efficiency, enhancing system reliability, and supporting smoother production processes. The project was executed by a professional engineering team following high-quality standards to ensure safe operation and long-term performance.

 

Project Information

Client Name:
Lafarge Cement Egypt
Timeline:
22 Oct 2023 - 12 Nov 2023
image6
Call support 24/7
Need Help? Call Us Now
01069711164
Cart (0 items)
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare